You asked: How long did it take to build the Gamble House?

Drawings, or blueprints, were finished by February of 1908, and construction began the next month. The three-story house was finished ten months later and the family was able to move in.

How long did the Gamble House take to build?

Not only did the Greene brothers create the structure, but they also designed the furnishings, lighting, textiles, and intricate architectural details throughout the house. Along with about 10 local craftsmen, the Greenes worked tirelessly over the course of two years to formulate every little detail of the house.

How much did it cost to build the Gamble House?

When it was built, The Gamble House cost $50,400 the garage (which now houses the bookstore), $3,700. The entire project, house, garage, furniture and landscaping cost $79,000.

What is unique about the Gamble House?

The architecture of The Gamble House is especially distinctive and significant for its straightforward, unadorned expression of these materials, and for its open arrangement of living spaces with numerous links to sleeping porches and terraces to take maximum advantage of the mild climate of the region.

What was the Gamble house made out of?

The conservation of Greene & Greene’s famed Gamble House in Pasadena, CA, was concerned mainly with exterior wood elements. More than a dozen wood species can be found in this home. Oak, redwood, Douglas fir, teak, cedar and other species were formed into timber beams, rafter tails, wall shakes and interior elements.

THIS IS IMPORTANT:  Is playing the stock market considered gambling?

What is Greene and Greene furniture?

Greene & Greene furniture. holds a unique place in the history of American woodworking. It marked a high point in the American Arts and Crafts Movement, uniting superb craftsmanship with some of the most thought- ful and sensitive designs ever produced.